Receive the latest industry news delivered right to your email inbox.
Retail / Services
Canem installed a gas dispensing system, pressurized line leak detection system/volumetric line leak detection system, point of sale system and vapor sensors at Peninsula Co-Op Gas.
Canem worked on Red Deer’s Bower Place Shopping Centre redevelopment, supplying Mall Corridor Lighting Improvements, new Electrical Services and Equipment, and other building upgrades.
The total construction schedule of Meadow Town Cinemas in Pitt Meadows, B.C. was a mere seven months; all interior construction and finishing occurred during the last two months of the project.