Home Company Profile Locations Projects News Careers

Page 1  2  3

Red Deer Regional Hospital
This project consisted of major renovation and additions to the Red Deer Hospital and involved the temporary re-location of over 30 departments to accommodate construction.  The project involved several phases

 

Surrey Taxation Centre

Surrey Tax Phase 3 is an existing 2 storey structure that was completely gutted then seismically upgraded to meet current seismic requirements. The project was done in two stages, at which time the client maintained operations in the phase not being upgraded.

 

Centennial Centre for Interdisciplinary Studies

The Centennial Centre for Interdisciplinary Science is located on the main campus of the University of Alberta, and will be a signature building on the University Quad. The centre will provide the space, environmental control, and technological capacities to meet teaching, research and technology transfer needs and accommodate the expected growth of the Faculty of Science over the next 10 years

 

 

University of Calgary Veterinary Medicine (UCVM)

Located on the University of Calgary campus, he first veterinary school built in several decades in Canada, which handles from small to large animals (up to 100 head of cattle). The project will lend itself to the betterment of not only Alberta’s agriculture industry but to veterinary medicine worldwide.

 

Edmonton Remand Centre

Edmonton's new remand centre is being built in the city's north end next to the Edmonton Young Offender Centre at 127 Street and 186 Avenue. The new facility will replace the 27-year-old Edmonton Remand Centre located in downtown Edmonton. It was one of four potential sites that were examined. It will house up to 2,000 inmates and alleviate overcrowding at the current facility.

 

Taylor Family Digital Library

The TFDL is part of a three-phase, $144 million project to be built by CANA Construction Ltd. In addition to the TFDL, the project involves construction of a new High-Density Library (HDL) building to house additional library collections, and the landscaping redevelopment of the Taylor Family Quadrangle (QUAD), an adjacent 285,000 square foot gathering place.

 

Red Deer Civic Yards Relocation

The Civic Yards project involves the relocation and amalgamation of the City of Red Deer infrastructure services.

Canem worked on five separate contracts covering 7 buildings and site work consisting of 132 lighting poles and 182 vehicle receptacles on a 75 acre site.

© Copyright Canem Systems LTD. 2010 Web design and Content Management System (CMS) by SnapTech